Turnkey Home and Apartment Renovation

Design, material procurement, installation and handover are coordinated under one contract and a written programme. The scope and target schedule are agreed before work begins.

  • Approved Scope & Written Estimate
  • Trades Coordinated Under One Programme
  • Formal Contractual Workmanship Warranty
  • Weekly Photo Progress Reports
Turnkey Home and Apartment Renovation

In the turnkey model, linked trades such as electrical, plumbing, plaster, tiling and painting are coordinated under one programme. The client does not have to manage material tracking and sequencing between separate teams.

The project proceeds under one contract: scope, materials by brand or product class, payment plan and target handover date are documented. If scope changes, the cost and programme effect is submitted for approval before execution. Progress can be reported with photos and video; final checks and the agreed cleaning are completed at handover.

Why EMC Decor

Transparent estimate: approved scope, labour and material items are detailed before the contract is signed.

Single coordination: electrical, tiling, plastering and painting teams follow one shared programme.

Material planning: alternatives are compared by technical suitability, lead time and budget.

Legal Security: Contractual workmanship guarantee & manufacturer material warranties.

COMPLETED WORK

Projects featuring Turnkey Home and Apartment Renovation

See how this service was sequenced with related trades and delivered on completed projects in Istanbul.

Bakırköy Apartment Renovation — Turnkey
Completed project

Bakırköy Apartment Renovation — Turnkey

Bakırköy6 weeks

The complete, turnkey renovation of an apartment in Bakırköy was completed within 1.5 months. After demolition, every stage — infrastructure, plastering and painting, flooring, installation — was carried out back-to-back on a single execution schedule.

View project →

The Challenges You Face, Our Fix

RISK 01: Missed deadlines and endless construction delays

SOLUTION: We build the programme around scope, procurement and site constraints, then document the target handover date and change procedure in the contract.

RISK 02: Hidden extra costs popping up mid-project

SOLUTION: Labour and material items are listed before work begins. Client-requested variations affect the budget only after written approval.

RISK 03: Poor workmanship, faulty plumbing & subcontractor chaos

SOLUTION: We coordinate trades under one programme, inspect critical work before it is concealed and state workmanship coverage in the contract.

What This Service Includes

1. Demolition & Structural Infrastructure

Removal of old finishes, partition wall construction, full rewiring and plumbing overhaul.

  • Laser-guided plastering & wall alignment (90° corners)
  • Complete electrical panel, sockets & cabling installation
  • Plumbing replacement & manifolds heating setup

2. Fine Finishing & Surface Coverings

Porcelain tiling, hardwood parquet installation, smooth painting and decorative wall claddings.

  • Large-format porcelain tiling with 45° miter joints
  • Skim coating and durable interior paint
  • Parquet flooring & matching skirting boards

3. Ceilings, Lighting & Final Assembly

Suspended drywall ceilings, LED cove lighting, fixtures and sanitary ware installation.

  • Drywall ceiling with concealed LED cove lighting
  • Built-in cistern, floating vanity & faucet setup
  • Post-construction professional cleaning & key handover

Process

  1. 1. Free Survey

    Our engineer visits your address in Istanbul, takes laser measurements and analyzes your requirements.

    Duration: 1 day

  2. 2. Transparent Estimate

    A detailed line-item estimate is prepared specifying work scope and exact material brands.

    Duration: 1–2 days

  3. 3. Official Contract

    Budget, exact handover date, and warranty terms are locked in the written contract.

    Duration: 1 day

  4. 4. Material Procurement

    All quality materials are delivered directly from manufacturers to the construction site.

    Duration: 2–4 days

  5. 5. Execution & Reports

    Our site manager coordinates all trades; you receive regular photo and video progress updates.

    Duration: 4–10 weeks

  6. 6. Cleaning & Handover

    Post-construction deep cleaning is performed, keys and warranty documents are handed over.

    Duration: 1–2 days

A turnkey estimate is based on measured quantities, material class and approved scope. Later variations require separate approval before work.

Get a Project Estimate

Frequently Asked Questions

How long does a turnkey home renovation take?

Duration depends on the managed scope, material lead times and site conditions. Project stages and the target handover date are documented after survey and product decisions.

Do I need to be present at the construction site?

No. Our site manager oversees all trades. You receive detailed weekly photo and video progress reports via WhatsApp without needing to visit.

How does the payment schedule work?

Payments are structured in stages. You pay only after each phase is completed and inspected together. Full upfront payment is never requested.

Let’s Talk About Your Project

Get a free consultation: share the project details in the form or discuss them directly on WhatsApp.