Apartment Renovation for New and Existing Homes
Apartment renovation requires both sound technical work and a plan that respects building management rules and shared areas. We coordinate both under one programme.
- Building Management Rules Reviewed Before Work
- Lift & Corridor Surface Protection
- Acoustic Soundproofing Solutions
- Contractual Workmanship Warranty

What separates apartment renovation from detached-house work is social discipline, not technique: working hours that match the building's rules, protected lifts and stairwells, daily debris removal and neighbours informed in advance. EMC Decor applies this protocol as standard — when the renovation ends, your relationship with the building is as good as when it started.
On the technical side, the critical points of apartment work are wet-area waterproofing, aligning new plumbing with the building's risers, and levelling floor heights against doors and thresholds. All three are measured at the survey, written into the process plan and verified on site with a laser level.
Why EMC Decor
Clean Building Protocol: Lifts and hallways covered, rubbish hauled daily.
Acoustic Comfort: A system selected for the wall build-up and intended use.
Coordinated Trades: electrical, tiling, painting and drywall work follow one programme.
Legal Security: Contractual workmanship guarantee & manufacturer material warranties.
Projects featuring Apartment Renovation for New and Existing Homes
See how this service was sequenced with related trades and delivered on completed projects in Istanbul.

Bakırköy Apartment Renovation — Turnkey
The complete, turnkey renovation of an apartment in Bakırköy was completed within 1.5 months. After demolition, every stage — infrastructure, plastering and painting, flooring, installation — was carried out back-to-back on a single execution schedule.
View project →The Challenges You Face, Our Fix
RISK 01: Building manager fines and neighbour noise complaints
SOLUTION: We notify building management, mask lifts/corridors, and haul out debris daily in sealed bags.
RISK 02: Airborne noise penetrating from adjoining apartments
SOLUTION: We select panels, framing and vibration-isolating fixings for the existing wall build-up and the target acoustic comfort.
RISK 03: Uneven floor heights and thresholds between rooms
SOLUTION: We pour self-levelling compound guided by 3D lasers, aligning wood and tile to a flush zero-threshold.
What This Service Includes
1. Common Area Protection & Demolition
Lifts and corridor masking, interior demolition, and floor levelling.
- Protecting lift interiors & hallways with heavy boards
- Internal wall demolition & bagged debris disposal
- Pouring laser-guided self-levelling floor screed
2. Plumbing, Electrics & Soundproofing
Rewiring electrical lines in conduit, repiping plumbing, soundproofing shared walls.
- Fitting acoustic soundproofing panels on shared walls
- Complete rewiring with fire-retardant cabling & new panel
- Silent PVC waste piping & pressure-tested water supply
3. Fine Finishing & Final Handover
Wall painting, parquet or tile installation, flush door fitting and final cleaning.
- Dust-free sanding & 2 coats of washable Jotun paint
- Laying parquet flooring with matching skirting
- Post-renovation deep cleaning & formal key handover
RESULTS OF OUR WORK
Process
1. Free Survey
Our engineer visits your apartment, takes laser measures, and checks building rules.
Duration: 1 day
2. Detailed Estimate
A comprehensive line-item cost plan and work schedule are drawn up.
Duration: 1–2 days
3. Official Contract
Handover date, working hours, and fixed price are locked in writing.
Duration: 1 day
4. Protection & Demolition
Common areas masked, interior demolition performed, waste hauled out.
Duration: 2–3 days
5. Services & Finishing
Plumbing/electrics updated, plastering, painting, and flooring completed.
Duration: 3–6 weeks
6. Cleaning & Handover
Deep post-renovation clean completed, clean apartment keys handed back.
Duration: 1–2 days
Apartment renovation cost is fixed in contract based on m² and material choices.
Get a Project EstimateFrequently Asked Questions
How long does an apartment renovation take?
Duration depends on the apartment's condition, approved scope, building working hours, material lead times and required drying periods. A target programme is issued after survey.
How do you avoid building manager fines during work?
We operate noisy machinery exclusively within approved HOA working hours. Lifts and hallways are board-protected and debris is cleared daily.
Is it mandatory to replace old wiring and plumbing in resale flats?
Building age alone does not determine replacement. Cable and pipe materials, connections, load capacity, corrosion and signs of leakage are inspected before deciding the scope.
Complementary & Recommended Services

Complete Renovation with Layout and Services Replacement
Complete renovation means stripping out most of the property and rebuilding its layout, services, substrates and finishes as one technical scope.

Complete Bathroom Renovation
A full bathroom renovation service covering every technical layer from infrastructure to final installation.

Home Interior Decoration and Feature Walls
The secret of good decoration isn't the material itself, but matching the right one to the right surface — chosen with 30 years of on-site judgment.

Wall and Floor Tile Installation
Large-format tile demands its own craft — double-sided adhesion, a levelling system, and laser-aligned joints that leave no hollow spots.
Let’s Talk About Your Project
Get a free consultation: share the project details in the form or discuss them directly on WhatsApp.