Complete Bathroom Renovation

A full bathroom renovation service covering every technical layer from infrastructure to final installation.

  • One scope for plumbing, waterproofing and finishes
  • System details at drains, corners and pipe penetrations
  • Tile setting-out coordinated with fixture dimensions
  • Defined sequence from strip-out to final installation
Complete Bathroom Renovation

A complete bathroom renovation is a broader technical project than simply replacing tiles and sanitaryware. Existing finishes are removed in a controlled way; water and waste lines, electrical connections, ventilation, drain position and floor falls are assessed against the current condition. Walls and floors are prepared back to a sound substrate, then the selected waterproofing system is completed with its specified corner, drain and pipe-penetration details.

The layout is planned around tile format, grout lines, niches, concealed cisterns, shower area, vanity and door clearances. Once finishes are complete, sanitaryware, taps, shower enclosure, furniture, mirror and lighting are installed, and connections and surfaces are checked before handover. More limited work that retains sound plumbing and waterproofing belongs to the separate Bathroom Refurbishment service.

Why EMC Decor

Correct sequencing of services, waterproofing and finishes

Details and checks matched to the selected waterproofing system

Drain falls, tile setting-out and fixture dimensions planned together

Defined scope for every stage from strip-out to final installation

COMPLETED WORK

Projects featuring Complete Bathroom Renovation

See how this service was sequenced with related trades and delivered on completed projects in Istanbul.

Akınsoft Plaza Commercial Building Renovation
Completed project

Akınsoft Plaza Commercial Building Renovation

Avcılar24 weeks

In Avcılar, a corporate software company's building-wide renovation needs were met on a single 5–6 month schedule: a wide scope spanning masonry and infrastructure work through to plastering and painting, ceramic tiling, and the renovation of shared-area bathrooms — all delivered under one contractor's responsibility.

View project →

The Challenges You Face, Our Fix

PROBLEM: Waterproofing details hidden before they are inspected

SOLUTION: Corners, drains and pipe penetrations are checked to the system sequence before tiling.

PROBLEM: New sanitaryware or furniture not matching service points

SOLUTION: Product dimensions, drains, water points and door movement are verified together before work.

PROBLEM: Unplanned grout lines, narrow cuts and incorrect falls

SOLUTION: Tile setting-out is planned around drains, niches, corners and fixture axes.

What This Service Includes

Strip-out and Services

Removal of old finishes and fixtures, with required water, waste, electrical and ventilation changes.

  • Controlled removal
  • Service alterations

Waterproofing and Finishes

Substrate preparation, waterproofing system, tile setting-out and grouting.

  • System details
  • Tile and grout

Fixtures and Final Installation

Installation of sanitaryware, taps, shower enclosure, vanity, mirror, accessories and lighting.

  • Connection checks
  • Cleaning and handover

Our Technology & Expertise

Wet-Area Details

Corners, drains, niches and pipe penetrations use the components of the selected system.

Layout and Falls

Fixture clearances, tile axes and drainage falls are coordinated.

Installation Compatibility

Product connections and fixings are checked against services and substrates.

Process

  1. Survey and Layout

    Services, moisture, dimensions and user requirements are checked before the new layout is confirmed.

  2. Controlled Strip-out

    Old fixtures and finishes are removed without damaging retained services and adjacent surfaces.

  3. Services and Substrate

    Water, waste, electrical and ventilation work is completed and substrates are prepared for finishes.

  4. Waterproofing and Tiling

    Compatible system details are installed, followed by tiling after the specified waiting period.

  5. Fixture Installation and Handover

    Sanitaryware, taps, shower enclosure, furniture and lighting are installed and connections checked.

Frequently Asked Questions

Are bathroom renovation and refurbishment the same?

No. Renovation may include infrastructure, waterproofing and substantial strip-out; refurbishment retains usable infrastructure and focuses on fixtures and surfaces.

How is waterproofing checked before tiling?

The check follows the selected system data sheet and drain detail. Layer continuity, corner tapes, pipe penetrations and drain connections are inspected before tiling; a ponding test is used where appropriate.

Can the bathroom layout be changed during renovation?

It may be technically possible, but drain level, pipe falls, ventilation, door clearance and shared services must be assessed together. Feasibility is confirmed at survey.

Who selects the tiles and sanitaryware?

Products are selected to the client's preference and technically checked for dimensions, installation type, maintenance and compatibility with existing services.